S2E11 BIM Project Execution Plan Part 2

BIMThoughts - A podcast by Bill Debevc - Martedì

Podcast artwork

Categorie:

Part two of our discussion on BIM Project Execution plan Marcello and Carla join me to expand our discussion during part 1.  In this episode we talk more about what is needed in the plan and what you should take in consideration in creating such a plan. This is such a big topic we are going to have more parts to the episode.  We have also created a special page on BIMThoughts.com that is a living outline of what should be included in the plan.  Feel free to leave comments on that page with additions to the plan. Topics and Links: When to upgrading the model. Autodesk Subscription National CAD Standards Scope boxes and guide grids in Revit Dynamo BIM The Owner’s Dilemma: Driving Success and Innovation in the Design and Construction Industry On Amazon http://bimthoughts.com/wp-content/uploads/2015/08/S2E11-BIM-Exec-Plan-Part-2.mp3 | Open Player in New Window

Visit the podcast's native language site